Temporary Works

Keeping a Concrete Supplier Operational During Critical Repairs – Melbourne

The Project

Shore Hire engineered a multi-product temporary propping solution exceeding 15 metres in height to support a Melbourne cement milling facility during critical bearing replacement repairs.

 

High-Load Modular Propping

Summary

With cable trays, plant, equipment and ducts occupying the propping space, Shore Hire's engineers designed a solution using Shore Prop 1000s for vertical support, Shore Prop 400s in raking positions, and propping towers built from Shore Prop 100s and Aluminium Tilt Props placed over 32mm Steel Road Plates to distribute load across service ducts. Engineered Blocks provided 2 tonnes of counterweight, eliminating the need to drill into the ground. The entire system was installed around existing obstructions without interrupting facility operations, allowing repairs to commence immediately.

Challenge

A cement supplier in Melbourne needed to complete critical repairs on their milling facility to replace seized bearings in the separator. This meant that the facility, which was over 15.9 metres tall, needed to be propped and supported while other structural members were removed and replaced.

Parts of the facility, including cable trays, plant, equipment, buildings, and ducts, were all located within the potential propping space, so the solution needed to ensure that these parts didn’t get in the way of the props but also didn’t need to be removed.

High-Load Modular Propping

Solution

To solve this problem, Shore Hire’s expert engineers recommended our Shore Prop 1000s because they have a higher workload capability for the longer lengths required for this project and could integrate seamlessly with the Shore Prop 400s that were installed in a raking position. 

Instead of drilling the props directly into the ground, which we didn’t know the condition of or what services might be underneath, we decided to utilise our Engineered Blocks, which provided 2 tonnes of counterweight. We also created propping towers out of a configuration of Shore Prop 100s and Aluminium Tilt Props. These towers were placed over our 32mm Steel Road Plates to help distribute the load and transverse over service ducts.

We worked together with the client to install the towers and place props around obstructions without having to disconnect or interfere with the facility operations.

Our engineers frequently visited the site to capture and understand the brief and created a solution that was able to accommodate changes and save the client on costs and installation time, allowing the work to the facility to start immediately.

If you would like to view our previous case studies, click here, or to learn how we can support your next project, request a quote today.