The Project

Shore Hire designed and installed a progressive propping solution to support the heritage façade, walls and roof of a Paddington townhouse during basement excavation and demolition works.

 

Propping a Townhouse Façade During Demolitions – Paddington

Summary

With the rear of the townhouse being excavated while the front walls, party wall and partial roof remained standing, Shore Hire worked closely with Rick Davis Contracting and Reform Projects to design a propping system using Shore Prop 200 and Aluminium Tilt Props. The solution was progressively installed to allow workers and a large excavator to operate around it simultaneously, while maintaining access to neighbouring properties and avoiding any clash with the incoming permanent structure.

Challenge

Shore Hire was contacted by Rick Davis Contracting to help brace and support the façade of a townhouse that was undergoing significant demolitions and renovations by Reform Projects.

While the front of the townhouse, both walls and half of the roof remained, a new basement and extension were being added, which meant excavating and removing slabs from the back of the townhouse.

In order to be able to do this safely, the remaining walls, floors, and roof needed to be braced to ensure the structural stability of the existing building.

We also needed to take into consideration that one of the remaining walls of the townhouse was a party wall, meaning that it was a shared wall with the neighbouring property.

Propping a Townhouse Façade During Demolitions – Paddington

Solution

Our team worked closely with the Rick Davis Contracting and Reform Project teams to provide a complete propping solution to progressively be installed so workers could work in and around our solution while maximising the remaining space for a large excavator.

We designed a propping system that would allow access to the townhouse, while not impacting any access options and still allowing the neighbouring buildings to remain operational. This system was effective but minimal enough to eliminate any clashing with the new permanent works and structure.

For this project, we designed, engineered, and installed a solution made up of our Shore Prop 200 and Aluminium Tilt Props, as these products are perfect for these types of façade retention projects, and their by-design lighter weight also reduces the risk of manual handling injuries during installation and dismantling.