This efficient 1,000-ton cooling tower offers a 3,000 gallon per minute (GPM) flow rate. Our 480-volt, heavy-duty cooling tower for rent is ideal for removing heat generated from large industrial processes, like those of oil refineries, chemical plants, thermal power stations and HVAC systems. Manufacturers include leading brands like EVAPCO.
  • 1,000-ton cooling capacity
  • 480V/3PH
  • 3,000 gallon per minute flow rate
  • 16,740 lb. shipping weight
  • 53' length by 102" width by 10'6" height including trailer
  • Uses: Ideal for heat management in large commercial buildings and industrial facilities

Project spotlight

Rental Cooling Towers Rescue Plants When Failures Occur

Cooling tower

Summary

A mechanical contractor partnered with United Rentals to quickly install a temporary cooling tower system after a catastrophic weather event damaged an industrial facility's equipment, severely limiting production. Leveraging modular designs, custom engineering solutions, and streamlined services, United Rentals provided a safe, efficient, and tailored rental solution to bridge the gap caused by extended lead times for new equipment.

Challenge

The need to replace a failed cooling tower at an industrial facility was urgent, because production was being severely limited. Due to extended lead times for new equipment caused by supply chain issues and other hurdles, the contractor needed a temporary rental solution that could be quickly installed despite space limitations and complex installation requirements.

Impact

United Rentals successfully provided a temporary cooling tower system that enabled the industrial facility to quickly restore production capacity, despite challenges such as space limitations, complex installation requirements, and supply chain delays. This solution minimized operational downtime, ensured safety during installation and operation, and simplified administrative processes, allowing the facility to continue functioning efficiently while awaiting a permanent replacement.